
V8EK4us- 383 SBC,4 link,Torana f/e - 12 months on...
-
- Posts: 400
- Joined: Mon Nov 26, 2007 9:56 pm
- State: NOT ENTERED
- Location: Darwin NT
-
- Posts: 400
- Joined: Mon Nov 26, 2007 9:56 pm
- State: NOT ENTERED
- Location: Darwin NT
Hey Spyder,
Thanks for the feedback and info re frontend it looks awesome but.....I think I will be looking at a more cost effective way of getting the wheel clearance ..... $5K
Let me know when it arrives, would love to have a close up look at it, what car is that going on?
Do you still have the EK sedan?
You will have to drop around for a coldy and check the progress on V8EK4US first hand
Cheers
Thanks for the feedback and info re frontend it looks awesome but.....I think I will be looking at a more cost effective way of getting the wheel clearance ..... $5K



Do you still have the EK sedan?
You will have to drop around for a coldy and check the progress on V8EK4US first hand


Cheers
Power windows & Central locking
Went to the wreckers and got hold of the power windows and central locking from a VS commodore Equip.
I have rough (very rough) mounted the power window mechanism (after cutting and shutting the arm) for a "test run" to make sure it would do the trick.

also added slide from commodore to EK glass retainer....... after this it works great, very smooth and quite.

These are the central locking units and complete door wiring harnesses from the VS. I will us the harnesses as it has all the plugs etc... for both the power windows and the central locking and the weatherproof boots to go between door and body.

The cutout for the Power windows will be completely removed and squared off, then I will fold a flat plate with two return folds to weld back in place, once this is done the mechanism will be hidden behind the new plate. will post pics as I get it done.

I have rough (very rough) mounted the power window mechanism (after cutting and shutting the arm) for a "test run" to make sure it would do the trick.

also added slide from commodore to EK glass retainer....... after this it works great, very smooth and quite.

These are the central locking units and complete door wiring harnesses from the VS. I will us the harnesses as it has all the plugs etc... for both the power windows and the central locking and the weatherproof boots to go between door and body.



The cutout for the Power windows will be completely removed and squared off, then I will fold a flat plate with two return folds to weld back in place, once this is done the mechanism will be hidden behind the new plate. will post pics as I get it done.


Cheers John and EKSPCL for the feed back.
I have mounted the central locking from the VS .... used the VS bracket with a bit of cut and shut ... a bit of welding and grinding ... a bit of primer and hey presto, one central locking unit fitted!! I cut the link of the VS latch and welded it to the EK latch, works fine.

Closed in the tubs as well.
Still need to tidy it up ....

.... dont think the spider webs were fire proof!!!!

cheers
I have mounted the central locking from the VS .... used the VS bracket with a bit of cut and shut ... a bit of welding and grinding ... a bit of primer and hey presto, one central locking unit fitted!! I cut the link of the VS latch and welded it to the EK latch, works fine.

Closed in the tubs as well.





.... dont think the spider webs were fire proof!!!!






cheers
OK.... started the chassis mods/additions/BEEFUP
Had to do some more rust repairs first, replace section of floor before adding the plates that will carry the "new chassis".

Then added the plate to carry the new rails and cross members... this is one of the front plates.

This is one of the back plates, also has the plate to carry the new section from the tubbed/relocated rail to the sill (as per the original setup)

This is the plate on the sill which will help lock in the new sub frame rail.

Who said cardboard is good for &^&%all!! Here are the trusty cardboard templates that were used to cut the "new sub-frame rail".

The new sub frame rail in place...........

New cross member stiffener on the front cross member.....

Both in place ready for chassis rail........

Oooohhh nooooooo!! the minister for War & Finance is home so I better chuck some primer on it and get cleaned up
chassis rails will be another day!!!

cheers, Garry


Had to do some more rust repairs first, replace section of floor before adding the plates that will carry the "new chassis".

Then added the plate to carry the new rails and cross members... this is one of the front plates.

This is one of the back plates, also has the plate to carry the new section from the tubbed/relocated rail to the sill (as per the original setup)

This is the plate on the sill which will help lock in the new sub frame rail.

Who said cardboard is good for &^&%all!! Here are the trusty cardboard templates that were used to cut the "new sub-frame rail".

The new sub frame rail in place...........

New cross member stiffener on the front cross member.....

Both in place ready for chassis rail........

Oooohhh nooooooo!! the minister for War & Finance is home so I better chuck some primer on it and get cleaned up









cheers, Garry
- ekdave1962
- Posts: 413
- Joined: Tue Oct 30, 2007 8:06 pm
- State: NOT ENTERED
- Location: Geelong Vic





Main chassis rail notched to match floor profile and tacked in place....


Main rail fully welded.......


Started other side ........ missus is home....... must stop now .......





cheers, have a great Sunday of R & R.


