No lace yet paint is ordered its in the ppg vibrance range its called ice ghost $125 for 250 mils
Got the motor fired up tonight sounds like the little red has a cam in it
Then we rebuilt the brake master cylinder and installed it then we rebuilt the clutch master cylinder Little bit of a problem the slave cylinder on the 5 speed is pissing fuild out so will have to rebuild this weekend.
Other then that will start putting the wiring in it radiator etc .
Can i get rid of the voltage regulator and replace it with some relays so i can hide out of site
Hey fatboy your utes looking cool dude, wish i had time to check it out on our little coastal jaunt. It was good to meet up and check out all your stuff. If your going through Qbn anytime let me know and i will return the shout!. Cheers......Chez
Got the motor started on wednesday night bit loud straight out of the extractors at 1030 at night.Started and idled straight away not bad for a motor not started for 12 years.Hooked every thing up today and ran the motor for 20 mins to get it hot enough to open the thermostat.Oil pressure was good.Need to get a muffler on it now to keep the neighbours happy.Bleed the clutch master cylinder and slave cylinder.just need to hook up the tailshaft and bleed the brakes.Then i can take it for a test drive down the street and back.
Started to bleed the brakes back went well went to the front and a hose blew out So looks like of to the brake shop to get two front hoses Back to wiring now
regards fat
New brake lines fitted just waiting for a mate to turn up to bleed them .Petrol tank has been wire brushed ready for paint but its pissing down with rain.
regards fat