Rocker and clutch cover, slave, exhaust, heater done. Linkages are a tight fit and need some bending or clearencing to floor. Will chat with RH about this. Slave hose inlet is close to subframe inner leg. I may jiggle the driveline over a tad just taking up slack. Already did this with mounting slave.
Started measuring driveline angles. Carbs are at zero horizontal. Engine 5.5 deg up to front. Diff 0.5deg up. I will have to put some wedges in the back at some stage by the looks.
The tailshaft got a second coat of metalfix. Should have used this on the box as well as it is good match to the original Aussie box colour.
Sent from my SM-G781B using Tapatalk